Edwards, D, Parn, E A, Sing, M C and Thwala, W D (2019) Risk of excavators overturning. Engineering, Construction and Architectural Management, 26(03), 479–98.

Ekanayake, E, Shen, G and Kumaraswamy, M M (2019) Mapping the knowledge domains of value management: a bibliometric approach. Engineering, Construction and Architectural Management, 26(03), 499–514.

Gan, X, Chang, R, Langston, C and Wen, T (2019) Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Engineering, Construction and Architectural Management, 26(03), 535–53.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects. Engineering, Construction and Architectural Management, 26(03), 386–407.

Juan, Y, Lin, I and Tsai, J (2019) A hybrid approach to optimize initial design strategies for pre-sale housing projects. Engineering, Construction and Architectural Management, 26(03), 515–34.

Newaz, M T, Davis, P R, Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(03), 462–78.

Ning, Y, Feng, M, Feng, J and Liu, X (2019) Understanding clients’ experience of trust and distrust in dwelling fit-out projects. Engineering, Construction and Architectural Management, 26(03), 444–61.

Wanigarathna, N, Sherratt, F, Price, A and Austin, S (2019) Design re-use: critical application of healthcare building design evidence. Engineering, Construction and Architectural Management, 26(03), 350–66.

Wu, G, Zhao, X, Zuo, J and Zillante, G (2019) Effects of team diversity on project performance in construction projects. Engineering, Construction and Architectural Management, 26(03), 408–23.

Zhang, L, Fenn, P and Fu, Y (2019) To insist or to concede? Contractors’ behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(03), 424–43.

Zhang, R, Xing, J, Ye, K, Lu, W and Shan, Y (2019) Synchronicity of global construction cost indexes. Engineering, Construction and Architectural Management, 26(03), 367–85.

  • Type: Journal Article
  • Keywords: Construction; Estimating; Competitiveness; Vibration; International practice; Bidding; Construction cost index; Synchronicity;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-02-2018-0045
  • Abstract:
    The purpose of this paper is to examine the features and tendency of cost indices in the global construction setting. Design/methodology/approach Data from 22 countries/regions are collected and analyzed using maximum variance formulation and Kendall rank correlation coefficient. Findings It is found that global construction cost indexes (CCIs) have commonly maintained a steady increase for decades, and the CCIs synchronize with each other. Overall synchronicity and synchronicity of different countries pairs have increased with time significantly. Research limitations/implications The major limitation, however, is the availability of data: only 22 regions/countries are examined, the distribution of these regions/countries is imbalanced between different continents and various indices are adopted around the world, of which statistical methods are not same. Practical implications The implication is that a better perception of CCIs enables contractors to have a robust estimation for bidding prices and to improve the efficiency of construction projects management. The research findings also provide a useful reference for those countries that have not established construction cost indices databases to forecast the tendency of domestic construction industries. Originality/value This paper contributes to the overall body of knowledge by presenting the co-movement of global CCIs and measuring the changes of CCI synchronicity with time and in different countries pairs.

Zhou, Y, Yang, Y and Yang, J (2019) Barriers to BIM implementation strategies in China. Engineering, Construction and Architectural Management, 26(03), 554–74.